๐Ÿ  Homeโš™๏ธ Services๐Ÿ“ Projects๐Ÿ“‹ Contact / RFQ
Get a Project Quote โ†’
10+ Export EPC Projects Completed Globally

Engineering-Led EPC
for Industrial Air,
Water & Material
Systems

Single-point accountability from concept to commissioning โ€” Air Pollution Control, Wastewater Treatment, and Material Handling, engineered for performance.

8+
Years Experience
10+
Export Projects
15+
Countries Served
3
EPC Disciplines
Industries Served
๐Ÿ—๏ธ Cement
โš™๏ธ Steel
โšก Power
โ›๏ธ Mining
๐Ÿงช Chemical
๐Ÿ’Š Pharma
๐ŸŽจ Textile
๐ŸŽ Food & Bev
Core EPC Disciplines

Complete EPC Across Three
Critical Industrial Systems

We engineer, procure, coordinate fabrication, install and commission โ€” end to end, under one contract, with one team accountable for all of it.

๐ŸŒฌ๏ธ

Air Pollution Control Systems

Engineering-led EPC for dust collectors, scrubbers, ESPs, and emission control systems built to CPCB and international compliance standards.

Bag FiltersWet ScrubbersESPCyclonesVOC Control
Explore Solutions โ†’
๐Ÿ’ง

Wastewater Treatment Plants

End-to-end EPC for ETPs, STPs, ZLD systems, and industrial water recycling plants โ€” designed to achieve discharge compliance from day one.

ETP / STPZLD PlantsMBRMBBR
Explore Solutions โ†’
โš™๏ธ

Material Handling Systems

EPC for bulk material movement โ€” conveyors, silos, stackers, and pneumatic systems designed for cement, mining, and power plants.

Belt ConveyorsSilosStackersPneumatic
Explore Solutions โ†’
The Real Problem

Why Industrial EPC Projects Fail
โ€” And How We Solve It

โœ• Common Problems

โœ•

Coordination between 5+ vendors creates accountability gaps and delays

โœ•

Procurement driven by cost, not engineering โ€” wrong equipment, wrong spec

โœ•

No single point of contact after project award โ€” issues fall between teams

โœ•

Systems commissioned but failing emission or effluent tests โ€” rework costs

โœ•

Cost overruns from poor site management and uncoordinated execution

โœ“ Target International Approach

โœ“

Single-point EPC responsibility โ€” one contract, one team, one phone number

โœ“

Engineering-first: design determines procurement โ€” not the other way around

โœ“

Senior engineer on every project from brief through commissioning handover

โœ“

Compliance designed into the system โ€” we engineer to the regulatory limit, not around it

โœ“

Agile lean execution model โ€” no multi-vendor coordination delays

Why Choose Us

What Makes Target International Different

We are not the largest EPC company. We are the most attentive โ€” and that is exactly what your project needs.

๐Ÿ—๏ธ

Engineering-First Approach

Every system is designed from real process data before we procure a single bolt.

โšก

Single-Point EPC Responsibility

One contract, one team, one accountability from basic engineering to plant handover.

๐ŸŒ

Export-Proven Track Record

10+ completed international EPC projects in 15+ countries.

๐Ÿ’ฐ

Optimised Procurement

25โ€“40% cost savings vs. local international contractors.

๐Ÿ‘ค

Founder-Level Attention

Your project gets senior engineering leadership and personal oversight.

โฑ๏ธ

On-Time Delivery

Clear milestones and accountability eliminate coordination delays.

Sector Expertise

Engineered for Industries That Cannot Afford to Stop

Our EPC solutions are shaped around the specific process requirements, compliance frameworks, and operational demands of each sector.

๐Ÿ—๏ธ

Cement

โš™๏ธ

Steel & Metal

โšก

Power Generation

โ›๏ธ

Mining

๐Ÿงช

Chemical Processing

๐Ÿ’Š

Pharmaceutical

๐ŸŽ

Food & Beverage

๐ŸŽจ

Textile & Garment

How We Work

Our 5-Phase Engineering-Led EPC Process

Refined over 8 years and 10+ completed international projects โ€” a process that consistently delivers compliant, on-time systems.

๐Ÿ“

Engineering Design

Process engineering, P&ID, equipment sizing, layout, HAZOP

๐Ÿ”ฉ

Procurement

Vendor selection from our qualified network

๐Ÿญ

Fabrication Coordination

Shop floor inspections, manufacturing oversight

๐Ÿ”ง

Installation

Civil, structural, mechanical, piping, E&I supervision

โœ…

Commissioning

Cold & hot commissioning, performance testing, training

8+
Years of engineering-led EPC
10+
Export projects completed
15+
Countries served globally
3
Core EPC disciplines
Project Portfolio

Recent EPC Projects โ€” Delivered Across India and International Markets

Every project below represents a system engineered from scratch, procured from our qualified vendor network, and commissioned to specification.

๐ŸŒฌ๏ธ
Air Pollution
๐Ÿ‡ฎ๐Ÿ‡ณ

Bag Filter System โ€” Cement Kiln

95,000 mยณ/hr | Pulse-jet | 150ยฐC design

CPCB-compliant bag filter EPC. Outlet: 12 mg/Nmยณ vs 50 mg/Nmยณ regulatory limit. Delivered on schedule.

๐Ÿ’ง
Wastewater
๐Ÿ‡ง๐Ÿ‡ฉ

ZLD Plant โ€” Textile Dyeing Facility

500 mยณ/day | ETP + RO + MEE + ATFD

Full ZLD EPC achieving 97% water recovery. Regulatory closure obtained within 30 days of commissioning.

โš™๏ธ
Material Handling
๐Ÿ‡ฆ๐Ÿ‡ช

Belt Conveyor System โ€” Port Terminal

2,000 TPH | 800mm belt | 1.2km

Bulk material handling EPC including structural, mechanical, electrical, and instrumentation. On time delivery.

View Full Project Portfolio โ†’
Export EPC Capability

Engineering Excellence.
Global EPC Delivery.

Target International has delivered EPC projects across South Asia, Southeast Asia, the Middle East, and Africa. Our Indian vendor network and export documentation expertise make us a trusted international partner.

๐Ÿ‡ฎ๐Ÿ‡ณ India
๐Ÿ‡ฆ๐Ÿ‡ช UAE
๐Ÿ‡ธ๐Ÿ‡ฆ Saudi Arabia
๐Ÿ‡ง๐Ÿ‡ฉ Bangladesh
๐Ÿ‡ป๐Ÿ‡ณ Vietnam
๐Ÿ‡ฎ๐Ÿ‡ฉ Indonesia
๐Ÿ‡ณ๐Ÿ‡ฌ Nigeria
๐Ÿ‡ฐ๐Ÿ‡ช Kenya
๐Ÿ‡ฟ๐Ÿ‡ฆ South Africa
๐Ÿ‡ช๐Ÿ‡ฌ Egypt
Client Validation

What Our Clients Say

"We engaged Target International for our cement plant bag filter EPC. The team delivered CPCB-compliant performance within the committed timeline. Senior engineering involvement throughout the project gave us genuine confidence."

PK
Plant Head
Leading Cement Manufacturer, Rajasthan, India

"Finding a trustworthy Indian EPC partner internationally is difficult. Target International's engineering quality, communication, and on-time delivery for our ZLD project in Bangladesh exceeded expectations at every stage."

MH
Managing Director
Textile Manufacturing Company, Bangladesh

"The single-point EPC model was exactly what our expansion needed. One team, one contract, one point of accountability โ€” from engineering through commissioning. The system has run without issues for 18 months."

AS
CEO
Chemical Process Company, Gujarat, India
Technical Insights

From Our Engineering Team

๐ŸŒฌ๏ธ
Air Pollution

Bag Filter vs ESP: Which Dust Collector for Your Cement Plant?

โฑ 8 min read๐Ÿ“… June 2025
๐Ÿ’ง
Wastewater

ZLD Technology: What Every Textile Plant Must Know Before the 2025 Compliance Deadline

โฑ 12 min read๐Ÿ“… May 2025
๐Ÿ—๏ธ
EPC

EPC vs EPCM vs LSTK: Which Contract Model is Right for Your Industrial Project?

โฑ 10 min read๐Ÿ“… April 2025

Have an Upcoming EPC Requirement?

Our engineering team provides a free preliminary consultation and responds to all technical enquiries within 24 hours.

Start a Project Conversation